1.Fiscal metering unit;
2.Off Spec Tank (V-25 000 m3);
3.Degasser Таnk С (Water treatment system);
4.Degasser Tank F;
5.Waste Management System (Phase 1, Waste collection area);
6.CMK existing wells (pipeline adaptors installation, 20 pcs);
7.Dalpari existing wells (pipeline adaptors installation, 5 pcs);
8.East Paydar existing wells (pipeline adaptors installation, 3 pcs).