Iran International General Contractor Company

DESIGNING, PURCHASING, MANUFACTURING, TRANSPORTATION AND INSTALLATION OF ONE WELLHEAD PLATFORM(F18) IN FOROOZAN FIELD



Project specifications:


Client profile 735278834ace94fa5f4e01972b0b632ad168cc66fbd37023561bc33606ef46ff

Client Name

IOOC

Contract c6511d21474e7b68c754dba20611b4827208a01fc6fb1e067b47b28926f4d52b

Contract Type

EPC

Map 697ac92d43ad565b0815bb7ebbc383372456845db808fc75c8d2a8b9dd255dc0

Location

PERSIAN GULF
Duration 2698b426f3e1b810181c4505fdd8807321f7ae97946147b8f1381114703f76db

Duration

'20' month

Date 761b810bc640cfdde28aaa08540c9aa33b564f40751f4c9481fe08695bba6e3f

Start Date

2012
Manhour 46596c69588a5a7325a16a57c5c3aae5feb00af3b8cf59b18402bfbecf128e87

Construction Man Hour

700،000 Man hour
Capacity 05ebd70d6d68d8d836aea261b495bc28a77de871dcf4ea30802fb100f6c03843

Design Capacity

-



News related to this project:



    .
  • Medium 1  large

    1 ) Installation of Foroozan F18 offshore well-head platform

    The F18 Jacket weighing 1800 Tons, transported from Qeshm yard and installed in Foroozan field in Persian Gulf Foroozan shared oil field with Saudi Arabia. Transportation and installation of F18 topside deck will be started subsequently within a short time.

    Read More
  • .
  • Medium jacket10

    2 ) WELLHEAD PLATFORM (F18)

    Fabrication of Foroozan F18 Platform including the relevant tests will be finished by the end of March 2016.

    Read More