'20' month
 
          Start Date
 
          Construction Man Hour
 
          Design Capacity
 
              On 17 June 2019, IGC finished the installation of F18 Platform in Foroozan Oilfield, (possessed in common with Saudi Arabia) located in the Persian Gulf, weighing 1200 Tons.
Read MoreThe F18 Jacket weighing 1800 Tons, transported from Qeshm yard and installed in Foroozan field in Persian Gulf Foroozan shared oil field with Saudi Arabia. Transportation and installation of F18 topside deck will be started subsequently within a short time.
Read MoreFabrication of Foroozan F18 Platform including the relevant tests will be finished by the end of March 2016.